Dunan hydro plant

Dunan is a 800kW hydro electric plant located near Rannoch Station 60 minutes drive from Pitlochry.

The project started construction in May 2015 and was completed in Summer 2016. The project controlled by DHG Hydro is a joint venture with the local Dunan Estate. Civil construction was being undertake by Glendinning Groundworks Limited and the turbine package supplied by Gilkes. The project includes a "buried" powerhouse to blend in and be sensitive to the beautiful natural surroundings.

Dunan hydro plant

Dunan hydro plant